HAVILAH TECHNOLOGIES

Service

Contested Metric Diagnostic

We help you settle a number fight: one metric, two disagreeing artifacts, a written ruling, and evidence SQL a controller can re-run — typically in about ten business days.

The work

How we help

When jobs are green and both dashboards refreshed last night, the problem is not “the pipeline failed.” It is grain, a filter, a copied business rule, or CDC that dropped a delete. We follow one metric from the operational document through ingest, fact, mart, and BI until the break is named.

The diagnostic is a scoped SOW. Implementation of the ranked fixes is a separate engineering engagement if you want it.

When this is the engagement

The jobs are green, both dashboards refreshed, and nobody will yield — close, commissions, a branch, or an agent is about to pick a side.

Contracted and invoiced by Havilah Technologies LLC. Delivery in your warehouse and your git.

Typical work

What an engagement looks like

  1. 01

    Intake

    Metric name, two artifacts, and access to warehouse, git, and the workbook.

  2. 02

    Trace

    Document → ingest → fact → mart → BI → downstream (bonus, scorecard, or agent).

  3. 03

    Ruling

    Which figure is valid for which decision, and the break class (source, grain, mapping, CDC, report logic, or copied rule).

  4. 04

    Handoff

    Evidence SQL, ranked changes, and the list of objects that must not be edited without a named approver.

What you receive

Deliverables

  • A written ruling: which number is valid for which decision
  • Evidence SQL your team re-runs
  • Ranked changes with hours and owners
  • A do-not-touch list for bonus, GL maps, and CDC filters

Capabilities

In scope

  • Trace from operational document through CDC, fact, mart, and BI
  • Ruling: which number is valid for close, operations, or compensation
  • Parameterized evidence SQL your team re-runs
  • Ranked fixes and a do-not-touch list

Method

Trace the number from source to report

  1. 01

    Operational document

    Invoice, job, contract — header vs line.

  2. 02

    CDC / ingest

    Deletes, late arrivals, what the pipeline actually kept.

  3. 03

    Warehouse fact

    Grain. The hop most fights actually live in.

  4. 04

    Certified mart

    The table both sides call source of truth.

  5. 05

    BI calculation

    Joins, filters, table calcs nobody remembers putting in.

  6. 06

    Downstream

    Bonus, branch scorecard, or the agent about to quote it.

  1. 01Ruling: which number is valid for which decision (close vs ops vs compensation).
  2. 02Break class: source, grain, mapping, late CDC, report logic, or a copied business rule.
  3. 03Evidence SQL — parameterized, they re-run.
  4. 04Ranked changes, hours, and owner.
  5. 05Do-not-touch list: bonus formulas, GL maps, CDC delete filters unless a named human approves.

Discuss Contested Metric Diagnostic.

Contested Metric Diagnostic is contracted under Havilah Technologies LLC. Tell us the stack, the systems, and the outcome.

Start a diagnostic